Tuesday, October 7, 2008

Pantry Quilt Backing is Done!

I've never pieced anything this big this quickly. Saturday night and Sunday night I worked out a design using leftover fabric from the front of the quilt and a few fabrics that I bought for the front but never used. After several hours of drawing, measuring, etc I discarded the first design I had and then came up with this one. Pieced Backing for the Pantry Quilt Sunday night I started cutting out the pieces, then this morning I started putting the pieces together. You can't see it but there is a white square in each corner. My thinking is that when I have finished quilting it I could add a few appliqued jars to the large white area, but I don't want to add them now. I am planning for the hand quilting to be outlining the jars, inside and out so I wouldn't want to have jars on the back that would have the quilting around jars on the front showing. However, I have plenty of time to think about this because it will be a long time before I finish the hand quilting on it, unless there are lots of people helping me quilt it at the Senior Center this Saturday.

Next I need to lay out the batting, trim it on one side and piece it on one end. Then I will be ready to begin basting. I have been spray-basting smaller things in the last year or so, but because this is so big I think I will baste it by hand. I'll be using my big Q-Snap frame to do that. I don't use it much for quilting as the height does not suit me, but it is convenient for basting.

Monday, October 6, 2008

Pantry Quilt Update

Late last night I finished the top on the Pantry Quilt Pantry Quilt Top Finished I like the braided border even better now that it is all done. (See the previous post for why I am working on this quilt now.) It was not as difficult as I thought it might be, but time consuming since there are a LOT of 1.75" x 5" strips in it - 85 each on the top and bottom, more on the sides. The quilt is 78" x 98" which makes it a bit bigger that the t-shirt quilt I made for Dave - and therefore the biggest quilt I have made to date. (Disregard the white sock on the couch - this was taken late last night and Dave was asleep on the couch!) Now I am working on a plan for the backing. I did not any wide backing fabric at Walmart that I liked, and don't have time to go out-of-town to a quilt shop this week, so I am taking a page from Erin and Bonnie Hunter and making do with what I have. I have some of the white left, and some of the woodgrain, as well as some multi-veggie prints that I bought to use on the front but ended up not using, so they will be on the back. Hopefully I will have that done by the end of today. I also have to piece some batting - the biggest piece I have is not quite long enough but is wider than I need, so I will try to piece it together. Any advice there?

Speaking of Bonnie Hunter - she has a great new book out - Scraps and Shirttails: Reuse, Re-purpose, Recycle! The Art of "Quilting Green" My autographed copy arrived a few days ago, and after going thru it quickly I was even more inspired to try to make do with what I have for the back of this quilt.

Saturday, October 4, 2008

How Do I Decide ~~~

One of the online quilting groups that I belong to recently asked the question - "how do you decide what to work on next?" It got me to thinking about how DO I decide. A few days ago I was working only on Lillian's quilt - see the previous post - but had to stop because I ran out of one of the fabrics for the backing of her quilt and had to order more. Fortunately, I was able to still find it where I got it first - Thousands of Bolts - and it arrived yesterday. Just have to wash it, cut one piece out of it, add it to the backing and I'll be ready to sandwich that quilt and start the hand-quilting on it.

In the meantime however, I met with the Senior Center quilting group and began to make plans for the demonstration that "we" are going to participate in on Oct. 11. Months ago I agreed to set up a quilting frame that was donated to the Center and have a quilt on it to be showing hand-quilting. This is to be part of their presentation for the "Mountain Days" celebration in Buena Vista where the Senior Center is located. So, we need a quilt to put on the frame. I had thought that maybe one of the other members would like some help on hand-quilting one of her quilts that is ready to quilt, but I was wrong. On to Plan B - to put another quilt on the frame --- but which one? I don't have any that are totally ready to quilt and the one that is the closest to being ready, Liliian's, I really don't want any help on. I go thru the other possibilities - BargelloBowl (no decision on the border yet and not very mountainy looking), Orange Crush Mystery (blocks are finished, but not sewn together yet), the quilt as you go blocks I started 20+ years ago (they are quilt as you go, not suitable for a frame), the Senior Center's Turning Twenty (but I have already made plans to quilt that on my friend's longarm). That brought me to my Pantry Quilt that we made at the Senior Center a few months ago. Others have finished theirs, but in my typical fashion, I had not finished my border nor decided on the backing. It would be appropriate for the frame however and I wouldn't mind having some help on it, and I did plan to hand-quilt it -- I just have to finish the borders and decide about the backing - before Oct 11. I wanted the border to be braided, like Bonnie Hunter does on some of her quilts, but had not finished sewing them together, and was really worried about how easy it would be to put them on. Since it seemed like the best choice for the up-coming demo, I am now working on it in spite of my concerns. Here is a picture of the quilt with one border on it - One Braided Border on the Jar Quilt The braid is made out of 1 3/4" x 5" strips from the fabrics in the jars. Last night I finished sewing on the first side. With lots of spray starch on the braided strip, and a pin on each strip, and slow, careful sewing I think it turned out pretty well. I have the the other side finished and starched, but not trimmed yet. One little problem with the quilting frame we have at the Center - there are no cloth leaders on it to attach the quilt to. One of the resourceful ladies in the group suggested that I temporarily sew a strip to the top and bottom of my quilt that I could then wrap around the rollers and pin in place. Sounds like a good idea, but I'm not sure I want to do that with these braided borders on the top and bottom, so I'm thinking that I will just sew some muslin strips to the top and bottom as they are now, after I get the other side border on, and let those muslin strips be what wraps around the roller. Would that work - I'm not sure. Maybe the muslin strips need to have some batting on the outside edges that would be the part wrapping around the rollers first - I'll have to think about that. Oh, and decide about the backing - pieced from what I have or buy a "fat back."

Monday, September 29, 2008

Lillian's Quilt Top Finished

I just finished piecing the top of Lillian's quilt - Lillian's Quilt Top Finished and am working on the back of it now. (Lillian is our new granddaughter who was born August 16.) I am planning to make the back one large 9-patch square like the ones on the front, using the purple/black/red fabric in the border and one of the lighter red prints, then make a wide border of the purple used in the narrow border on the front. I am also working on a plan for the hand-quilting designs using a few extra blocks that I had. I've used a couple of purple fabrics that I used in her sister Reba's quilt which I think is fun to do. The pattern is "Glory Days" from Fons and Porter's Love of Quilting magazine, July/August '08 issue - I've just made mine more scrappy than theirs. I'm hoping to get the back pieced today, then I'll be ready to sandwich it. I've used spray basting a lot recently so think that I will use that for this quilt, but want to try it on my little sample first since I'm not sure how it will work with handquilting. I'm planning to use a new kind of batting - Quilters Dream Green. It is 100% polyester and is made out of recycled plastic bottles. I'll post a photo of the back when I get it done.

Friday, September 26, 2008

Quick Zip System questions

A couple of days ago a quilting friend of mine let me come practice some on her Gammill. I used some of the pantographs she has and also did a little free-motion quilting. I have several quilts in progress that I would like to try quilting on her machine, but we are wondering how to best do that when she also has quilts to do for a few customers as well as for herself, and she has another friend who also uses her machine some. We are looking into the Quick Zip System as a way to easily change out quilts that we are working on since we don't think any of us would necessarily be able to finish one in a single segment of time. Does anyone out there have experience, good or bad, with this system? Here are 2 links to a description of the system - KM Quilting Supply and Quilting Connection. Sounds like she would need to have a machine set and then each of the users would need a quilting set.

Thursday, September 25, 2008

Fallen Leaves, Turning Twenty and GFG Progress

Last week I finally finished my Fallen Leaves wallhanging. Fallen Leaves wallhanging completed It is a tissue foundation pattern from Cindi Edgerton that was fun to do. I bought mine as a kit at Cottonwood in Charlottesville, VA - primarily because I couldn't resist the fabric that was in the kit for the border and backing. I searched online until I found more of it to save for another project. This is a project that I started last September when I bought the kit, then it languished while I worked on and completed other more pressing projects, mostlly for other people. I had even finished most of the quilting on it - just had to finish up some of the borders and bind it. Now I am looking for a special spot in our house for it to hang. I am pleased with the way the quilting turned out. I just used a regular foot and left the feed dogs up - I'm not ready to cut loose with free motion yet - and found that I was able to move the quilt around enough to to make the wavy lines thru the leaves. There was a lot of starting, stopping, and turning in the border but it is a good example of where I am now in my quilting odyssey.

The Senior Center group that I quilt with has finished the top of the Turning Twenty quilt Senior Center's Turning Twenty Quilt that we have been working on. We are planning to make the backing by using a lighthouse fabric in the center and a light taupe fabric surrounding it, since the recipient really likes lighthouses. I should have that pieced by our meeting next Wednesday, then we can begin sewing together the blocks we have for a 2nd one. These will be gifts for the director and assistant director at the Center - one of them knows who this one is for, but neither of them yet know about the other one, which is a pretty neat trick when both of them are usually there when we are meeting and working on them. Both of them are being made from fabric donated to the Senior Center, either by us or by other quilters in our area.

I am also continuing to work on my Grandmother's Flower Garden. This picture shows the progress to date - 4 rows of the 9 I expect to do will be done when I finish attaching the last flower on the left in the bottom row. grandmothers flower garden 34 plus I have laid out some of the fabrics I think I will use for the next row - the pink and green one is finished and the pink and blue one is partially finished.

We went to the Atlanta area again last weekend for a family wedding, a Braves game and to check in on some of the grandkids. I had time to make a quick stop at Tiny Stitches in Marietta where I met Melinda in person. I will definitely go back to that shop!

Friday, August 29, 2008

New Granddaughter and Quilting Progress

My quilting has taken a back seat since August 13 when I left here to go to Johnson City, TN to visit my mom for the night, then on to Marietta, GA to stay with our oldest daughter and her family. They were expecting their 3rd child on August 16 and needed some help getting ready and someone to stay with the older two while they were at the hospital. Lillian arrives Saturday afternoon just a few minutes before I got to the hospital. I would have loved to be there for the arrival, but was staying with the siblings. Our middle daughter and her husband came up to help with the kids, but I didn't leave quite soon enough after they got there. I did get to hold Lillian a few minutes after I got there and later that afternoon this picture was taken of me with the three siblings. Nana with Jack, Lillian and Reba If you look closely you can see that Jack and Reba were just as interested in Mom's crackers as in Lillian! After Lillian and her mom came home from the hospital my son and his son, Atticus, came from Athens, GA to visit - here are cousins Atticus and Jack in the Disneyland t-shirts we bought them Atticus and Jack in their new Disneyland shirts from us . Reba wanted me to take pictures of her too, so here is one of the best ones - Reba .
I had time for dinner at a cute little restaurant, The Fickle Pickle in Roswell, with my nephew, his wife and their new baby, Sofie. Here they are with the quilt I had just given them for her -
Wade, Sofie and Julie with Sofie's quilt Yes, Sofie has red hair - hopefully it will be as beautiful as her mom's!
I did get a little quilting done while I was in GA. I have started a quilt for Lillian -
Lillian's quilt I have eight more stars to piece and the outside border to finish piecing. Those stars are hard for me to get just right, so I have taken a little break from it and have been working on my Grandmother's Flower Garden. I now have 25 out of probably 91 flowers - Grandmother's Flower Garden with this on our bed I have a better idea of how far I have to go! I am sure after this weekend I will be getting back to Lillian's quilt, but this weekend we are going to DC to see 2 Braves' games, then back home Sunday night and the probably to Richmond for the last Richmond Braves' game Monday afternoon. I see more GFG flowers being made on these trips!

Monday, August 11, 2008

My Guild's Quilt Show and Allie's Quilts

My Guild, Rockbridge Pieceworkers Quilt Guild, has a quilt show as part of the Rockbridge Regional Fair in July. I joined the guild in August 2006, but was not ready to put anything in last year's show. This year I put two of my quilts in the show - the T-shirt quilt T-shirt quilt at the quilt show and the Butterflies and Hydrangeas quilt Butterflies and Hydrangeas at the Quilt Show. Neither of them won a prize, but it was neat to see them displayed in a public place. The quilting group that I lead at our local Senior Center also put a quilt in the show that several of us worked on, so that was neat for those ladies to see their handiwork on display. Senior Center Sampler hanging
For me the best part of the quilt show was that our youngest daughter entered 5 of her quilted wallhangings in the show. I am showing them here with their labels so you can see what she said about each one. She is in her second year of working on organic farms in the Columbia County, New York area. "Flame,"
Flame with sign "Chocolate," Chocolate with sign "Bodo," Bodo with quilt show sign "Wiltsie Bridge," Wiltsie Bridge with quilt show sign and "El Corazon." El Corazon with sign She has painted on some of them, and I think just did a terrific job on them. She has an art background, but has only been quilting for a couple of years.

Allie just recently finished a quilt for the daughter of her current employers that they commissioned her to make for their daughter's wedding. Here is a picture of her and my hubby with that quilt -Lila's quilt with Allie and Dave She designed the quilt herself, cut out all those orange flowers from some batik fabric and machine appliqued them on, machine quilted the quilt and included some botanical designs in the quilting and has a quote from Khalil Gibran quilted in cursive writing around the border - Quite an amazing job I thought! The couple did not see the quilt until the reception, where it was hanging up for all to see.

Friday, August 8, 2008

Where to start with an update?

It's not that I haven't been quilting, although summer and summer trips have intervened in that a bit. Since my last posting, we went to Cincinnati for a weekend to see the Atlanta Braves play the Reds, one of our daughters and her husband visited for a weekend, we went to Anaheim for a library conference and stayed to be tourists for a few days, we had a week in Hatteras Village on the Outer Banks, and we went to Richmond to see the Richmond Braves play. Next week I will go to Atlanta for the arrival of #4 grandbaby - my oldest daughter's 3rd baby is expected to be delivered on Sat, August 16, unless she decides to arrive earlier.

In between these trips I have been doing some quilting. The only one that I have finished is a rag quilt for my second great-niece, but I don't want to show it until I have given it to her, which will happen sometime while I am in Atlanta. I have finished all but about 6 blocks of the Orange Crush Quilt, and have started putting the rows together. Here is a possible arrangement for it - Layout for the Orange Crush Quilt and a picture of the one corner that I have sewn together - One corner of the Orange Crush Quilt I'm thinking that for the border I want to use a narrow strip of the black and then a wider border of the green, with a few of the leftover blocks centered as shown on each side of the quilt. However, since this is not for anyone but us, it is now on the back burner with several other quilts.

At our July guild meeting we had a workshop on the New Orleans Puzzle Quilt. Here is what I did during the workshop 1/2 of New Orleans Puzzle Quilt - this is 1/2 of it. It is also now on that same burner since it is for us too. We had to sew all of our strips together for this project before arriving at the meeting so that we could get this much done during the workshop. It can be finished to have all these points and used as a table-topper or wall-hanging, or could be finished by filling in around the corners with trapezoid-shaped pieces to square it off. I'm thinking wall-hanging, but we'll see.

Since we are having a new granddaugher soon I am working on a qult for her now. Her parents have requested something with red, purple and black - and nothing babyish. After much searching online I found a fabric that has all of that in it and have now added considerably to my stash in those colors. I am using a Fons and Porter Love of Quilting pattern, July-August issue - "Glory Days" - but using lots more fabrics. Here is what I have done so far on it, photographed on the usual blue carpet. Lillian's quilt - 14 blocks I think I will not use the goldy cream that is the center of one of the stars -- it goes with the focus fabric, but doesn't seem to fit in with the rest of the quilt. Those 9-patches are easier to make than the stars -- can you tell?? Our guild had a quilt show last month - I'll talk about that in my next post. And I will try to make that soon - at least before I head out to Atlanta on Wednesday afternoon. I have to plan my computer time more carefully now since we use the computer to watch and/or listen to the Braves on MLB.com - and we watch every game they play!

Wednesday, August 6, 2008

Testing to see if I can post a blog entry

I received a message from Blogger recently that my blog had been identified as possibly being a spam blog! I had to request a review of my blog in the next 20 days or my blog would be removed, and until that review had been completed I would not be able to post to my blog. I requested the review right away, but have not heard back from Blogger. I am testing to see if I can now post again.

Saturday, May 24, 2008

The Retreat Quilt

At our guild's retreat earlier this month we each signed and wore a nametag that Erin made just for the retreat. We asked each person to bring 3" squares to make some scrappy 4-patches using the leaders/enders method of Bonnie Hunter. We collected all the nametags and the 4-patches at the end of the retreat because Erin had the idea to make a quilt from them, and then to give that quilt to one of the attendees. This past Wednesday and today Erin came over to my house and we put together the quilt top. Here we are working on the top Erin and Nancy with retreat quilt and here it is finished. Retreat Quilt She has backing, I have batting, we just need to write a message in the center block and get it quilted. I had never done a quilt on-point so it was great to learn how to do that. She had a book that showed how to determine the size of the corner and setting triangles. I also found a good description of how to do it on Janet Wickell's site. It was lots of fun to work on the quilt together, and to spend some time visiting too. Erin, it was fun working with you on the Retreat, and the Retreat quilt!

Monday, May 19, 2008

OC updates and our Senior Center Sampler

I am happy to report that I finished all of the blocks for Clue #3 in the Orange Crush Mystery and got a start on #4. Here are all of Clue #3 Orange Crush Mystery Clue 3 Group and 2 of them up close. Orange Crush Mystery Clue 3 And here are the 6 I've done of Clue #4. Orange Crush Mystery Clue 4 For #4, I have all the strips cut, then lay out one of each as Bonnie suggests, cut them with the Easy Angle ruler, sew one strips' sets together at a time, position them on the cutting mat, then place my 4-patches into those 4-5 blocks, trying not to have the same fabric twice in one block ~~ guess that makes mine a "controlled scrappy" arrangement. I'd like to move along on this project some more this week, but first I need to do some work on the sampler quilt we are doing at the Senior Center.

Last Wednesday at the Center we (read that as "I") got the 4 rows sewn together on the fronts. We are doing this as a quilt-as-you-go so each block has already been quilted. Senior Center Sampler Quilt - sewn together Now I need to begin the work on the back, positioning the batting, trimming off some of the batting, and figuring out how to fold one side of the backing pieces over the others so that it looks neat when finished. I am hoping some some of the other ladies will be able/willing to help with the handwork of stitching the backing pieces together. I've not done this before except on a sample, so we'll see how it goes. This quilt will be given to the Center to hang when we finish. Then we are going to start work on some Turning Twenty quilts.

Sunday, May 18, 2008

Back home from Georgia; OC and GFG update

We left here Tuesday, May 6, after work and went to Johnson City, TN, for a night with my mom, then on to Atlanta on Wed. We checked into our hotel and met one DD and her husband at the Braves game - a tradition for us whenever possible when we are in ATL. Thursday morning (while DH was attending his conference) I met oldest DD to get her son, and his carseat; he and I drove to Zoo Atlanta and met DS and his son there for several hours at the zoo with the boys - 4 yr old and a 3 1/2 yr old. Fun, fun, fun, and very heartwarming to see my son's parenting in action. He is a stay-at-home dad and very good at it! Here he helps Jack and Atticus share some "fluff" - I think this was the highlight of the zoo visit for the boys! 'Sharing Thursday evening there was a reception for the conference where we managed to get enough food to count as dinner. Friday morning I relaxed around the hotel a bit, then DH was thru with the conference and we sat out to explore. He grew up in Chamblee, and we are back there several times a year, so the area is not all that new to us, but it keeps changing! We went up to the Perimeter Mall area, detouring by the house in Chamblee that his family used to live in. Then we decided to try to get to Marietta without going on I-285 ---- and discovered that there may be a way, but the way we went was not quick and might not be the best way! We did eventually find our way to Red Hen Fabrics, after being on Marietta Parkway much longer than was necessary. I've been to Red Hen several times, and like to go back there frequently when I am in the area. They will be moving their shop to another location about 1 mile away at the end of the month. Oldest DD and her family live in Marietta and we spent Friday night and Saturday morning with them - even got to babysit her 2 while she and DSIL did a little shopping. Here I am with Reba and Jack more resting Then to McDonough to visit middle DD and her hubby. Marietta DD and her family followed us there, and DH's mom and one of his sisters came down from Flowery Branch, plus McDonough's DSIL's parents, grandparents and sister were also there. Good times, great food from the grill; we spent the night there and then it was back to Lexington on Mother's Day. We got home just in time to quickly grill some steaks for dinner. I've posted quite a few pictures from our trip on our Flickr page.
Quilt-wise I worked only on my Grandmother's Flower Garden -- it is so portable when you are working on the individual flowers. Here it is now - 18 sewn together and 3 (far left ones on rows 1, 3 and 4) ready to sew on. GFG 18 +3 I've now had a few days to get re-oriented to being at home and trying to catch up a bit on stuff.
Thursday I got off my part-time job a bit early, and spent some good time working on the OC quilt. It will soon be time for Clue #5, and I was still working on #2. Last night I finished Clue #2 Orange Crush Clue #2 and got all the pieces cut for #3. Last week I jumped ahead to make one block of Clue #4 to see if I still like the fabric I selected for Bonnie's "red" - I do like it! Orange Crush Clue #4 Can't post it on the Quiltville Group yet since I don't have but one made - but I can post it here! I'm hoping to get all of Clue #3 done today.

Sunday, May 4, 2008

Orange Crush Mystery Update, GFG

I think I am now in the "Lagger's" Group on the OC mystery. I finished the Clue 1 blocks - 150 4-patches - before Clue 2 was given, but have slowed down since then. DH and I were in DC last Sunday-Wednesday for him to attend a library meeting, and I brought along my OC fabrics and sewing machine. Bonnie's instructions were to cut our scraps into strips prior to starting the steps, but I had not done that yet except for what I used for the 4-patches. So I had all the fabrics with me at the hotel that I wanted to use for this step. I got the strips cut for Clue 2, all of the large triangles cut, all the squares cut, and some of the little triangles. I had already sewn a few together at home and after measuring them I realized they were a bit smaller than they should have been, so I decided to make my seam allowances slightly less than 1/4" when sewing the "wings" to the squares. I was able to get about 27 of the 142 finished while at the hotel -- and still had time to eat all meals with DH, go to a reception one night, a Braves game one night, etc. However, very limited time on Internet so was pretty far behind on reading the messages in the Quiltville group. I had seen just a mention of the way you are supposed to cut and sew on the "wings." When I got home Wednesday night I read all the messages that had come thru while I was gone, and realized that I had cut the small light triangles incorrectly. I am using strips of 30-40 lights, so don't need that many from any of the fabrics, and therefore I am cutting them pretty much as I need them, and cutting them one at a time with the fabric always facing up. Now I see that that is wrong - the points on the corners don't match up, so .............. this afternoon I started over on assemblying Clue 2. I don't have enough done to photograph yet - 3 to be exact! And we are going to be out of town this week from Tuesday afternoon to Sunday night, so I will be even farther behind when I get back. I will have time to work on my Grandmother's Flower Garden - Grandmother's Flower Garden - 18 flowers a great thing to work on in the car, but I won't be taking the machine with me on this trip. We are going to Atlanta area for another of DH's conferences, but will be seeing kids and grands too ~~ and another Braves game.

Guild Retreat is History Now

How can it be 4 weeks since my last post? So many times I have thought - "just let me finish this next thing then I will post about it on my blog." Silly me!!! Most of the past month has been spent getting ready for my quild's Quilt Retreat - I was on the committee to plan it, and we had decided to make a "saddlebag" for each attendee. Here is a picture of all 9 that I made All Nine Saddlebags and a closeup of one laying flat Full View of Saddlebags and of the same one hanging on the arm of a chair Closeup of Saddlebags for Retreat One of the other committee members had been given one and she drew out the pattern for us. It took more time to select the coordinating fabrics than it did to actually make them! We had been given some fat quarter/fat eighth bundles by one of the other guild members, and I made 10 more of them so we'd have one for each saddlebag. Here are the bundles I made - Fat Quarters and Fat Eighths Packets for Guild Retreat Again, it took longer to decide on coordinating fabrics than it did to make them. I also made 4 Toasty Toe Warmers to give as door prizes. Here are two of them. Toe Warmers for the Retreat They are made by sewing 3 sides of 9 pouches together (a 4.5" flannel square and a 4" muslin square with a tuck in each side of the flannel piece), filling each of the pouches with 1/3 cup of aromatic rice, then sewing the pouches carefully together on the 4th side. Sew them together like a 9-patch, then assemble them as you would to "birth" a quilt.

Marty Moon from Culpepper, VA was our teacher. She taught a class on Friday on making Drunkard's Path blocks. She has just recently started using Quiltz Dual Arc Drunkards Path Templates. We had not seen them before - I think she saw them for the first time at a recent quilt show in Atlanta. They are made by someone in Bowdon, GA. It is a set of 4 fluorrescent green acrylic templates that you use to cut both of the shapes for the drunkards path. Each template is used to cut both the pie and the L shape - and each one makes a block of a different size. Some people were able to finish piecing and sewing a top before we finished for the day. I was not one of these, but I did get 16 blocks made, and an idea for what I want to do next. Here are photos of 3 different designs I considered for my drunkards path Drunkards Path pattern 1 Drunkards Path pattern 2 Drunkards Path pattern 3 She also showed us how to make coasters by folding and stitching 5 blocks together, then flipping them inside out.

We played a version of Strip Poker after the workshop was over. Thanks to Jen for the link to her post about it. We had decided to make it fairly simple for all, so we just played Five Card Draw and the most you could lose in one hand was 2. We told the members to bring 15 or so 2.5" strips, but Erin and I, the other committee person in attendance, brought extras. I had 43 strips - all neatly rolled up and tied with DMC thread - when we started. I gave 10 to one of the gals who didn't bring many, and by the end of the poker hands I had 6 left. I had never played poker before so the night before the retreat started I practiced at home with several hands -- I don't think that helped! But it was fun and enjoyed by all who either played or watched -- and revealing about who among us knew ALL about playing poker! We also had two local massage therapists come to give 10-minute massages to all who wanted them - what a great treat --- shoulders, backs, arms, hands - we were all so relaxed afterwards. Erin showed folks how to use 3" squares that we asked them to bring to make 4-patches using Bonnie Hunter's Leaders and Enders method. We will take those 4-patches and make a quilt using them and the nametags we each signed and wore. The quilt we make from all that will be given to a name drawn from the list of the attendees as a special momento of the retreat.

On Saturday Marty gave an embellishment workshop. I made my first yo-yo without a yo-yo maker, learned about couching, weaving, stamping, piping, etc. It was a fun time to play with some things we had never done before. After lunch of the yummy leftovers from the potluck dinner the night before, Erin showed the group how to make some scrap blocks using Bonnie Hunter's method of sewing pieces onto strips, cutting those strips into segments, sewing those segments, etc. It was interesting to hear everyone's comments about doing that. Some who are scrap quilters at heart were happy to see a new way of doing that -- Erin had 3 quilt tops to show as suggestions for how to make them up. Others who had never used scraps had a hard time of letting go of rules enough to do it. Here is a link to Erin's blog on which she has posted 2 pictures of one of her tops in progress - they are the bottom 2 photos. We all had time to finish several scappy blocks before folks started going home.

We think everyone had a good time, and learned some new things, and grew closer as a group too. Our guld now has about 65 members, and only 25 could come to the retreat, but we had no one on a waiting list so I guess about everyone who wanted to come got to come. And Erin and I are looking forward to being just retreat participants next year!!

Sunday, April 6, 2008

Orange Crush and Batik Block Swap Update

To my surprise, I have finished the 150 4-patch blocks that was the first step in Bonnie Hunter's Orange Crush mystery. Orange Crush Mystery Quilt - step 1 This photo shows them with the yardage fabrics - and a bottle of Orange Crush. The next clue probably won't be published until around April 14, so I have some time to catch up on some other projects in the meantime. For these 4-patches we were to use neutral and dark scraps. I think I probaby used 50 or more fabrics, but since I am not quite to the truly scrappy mindset I tried hard to make sure that no two of the 4-patches are alike.

I also finished the other two blocks for the Spring Batik Block Swap on Carol Doak's Yahoo Group. Here is block #3 Spring Batik Block Swap #3 and #4 Spring Batik Block Swap #4 Number 3 is Nancy's Block from Carol's 40 Bright and Bold Paper-pieced Bocks. Number 4 is F88 from the Bonus Blocks of the Designer Edition of Foundation Factory. Now I only need to make the Bonus Block. The whole group will be invited to vote on which one they like the best, with the winner getting the other 15 or so in her group of Bonus Blocks. I know which pattern I want to use for that, and think that I have picked out the fabrics I want, but not where to put what. I need to get them in the mail around the 15th so that doesn't give me much time to finish!

I showed the ladies at the Senior Center some of Bonnie Hunter's scrap quilt designs last Wednesday since we are beginning to think about what we want to do next. One that I like is Maverick Stars - but they all agreed that they didn't want to do that one since they thought people who looked at it would think they couldn't make an accurate star. They did seem to be interested in doing one of her string quilts, so we'll see how that goes. At the next meeting we will be working on quilting the sampler blocks that we made last fall.